CDC Restoration & Construction

  • Home
  • Services
    • Resinous Flooring
    • Parking Structure Repair
    • Concrete Repair
    • Post Tension Repair
    • Carbon Fiber Composite Strengthening
    • Secondary Containment Linings
    • Heavy Duty Flooring Systems
  • Industries
    • Automotive
    • Aviation
    • Chemical Processing
    • Food & Beverage
    • Mining & Metals
    • Parking Garage Repair
  • Projects
  • About
  • Contact
  • Home
  • Services
    • Resinous Flooring
    • Parking Structure Repair
    • Concrete Repair
    • Post Tension Repair
    • Carbon Fiber Composite Strengthening
    • Secondary Containment Linings
    • Heavy Duty Flooring Systems
  • Industries
    • Automotive
    • Aviation
    • Chemical Processing
    • Food & Beverage
    • Mining & Metals
    • Parking Garage Repair
  • Projects
  • About
  • Contact

Secondary Containment Construction and Lining

Picture
CDC Restoration & Construction specializes in the complete engineering, construction, repair and retrofit of Secondary Containment Structures and Lining Systems.

​We install various types of chemical and temperature resistant coatings, specialty concretes and mortars for complete secondary containment protection during the event of a primary containment system failure.

​We have combined the latest technologies in high strength rapid curing concretes with fast cure chemical resistant linings to provide complete retrofit of new secondary containment structures in as little as 3-10 days to minimize impact on daily operations. 

Secondary Containment Systems

  • Epoxies
  • Novolac Epoxies
  • Vinyl Esters
  • Novolac Vinyl Esters
  • Chlorendic Polyester
  • Flouropolymers
  • Modified Polyurethanes and Polyureas
  • Polymer Concretes
  • Reinforced Permanent and Temporary Secondary Containments
Picture
Picture
Picture

Secondary Containment Case Study

CDC provided design and installation services of this 11,000 SF Secondary Containment Structure for a metal extrusion facility.  The existing containment structure was demolished and the site remediated.  The new concrete secondary containment was constructed with composite rebar reinforcement and our proprietary rapid curing concrete that allowed for resinous coating application within 24 hours.  For the final chemical and temperature protection, a liquid applied Vinyl Ester lining System was installed consisting of Vinyl Ester Primer, patching and coving components and a 75-80 mil Vinyl Ester Mortar with Glass Mat Reinforcement.  Once cured, the system was detailed and received two final top coats of Glass Flake Filled Novolac Vinyl Ester to complete the system.  Unique features such as fully composite walkways, hardware and prefabricated pump and equipment pads were utilized for optimal corrosion resistance and rapid installation.  Modular chemical resistant equipment pads and bases were pre-fabricated onsite, prior to the facility shutdown.  This minimized down time and allows the customer flexibility for future re-configurations within the secondary containment.  The entire project was completed and returned to service in 15 days. 
Picture
Before
Picture
Forming Phase 1 / Grading Phase 2
Picture
Modular Vinyl Ester Pads
Picture
Glass Mat Saturated on Phase 2
Picture
Modular Chemical Resistant Pads
Picture
Equipment Installation
Picture
Completed Glass Mat Vinyl Ester
Picture
Before
Picture
Phase 1 Poured / Steel Tied Phase 2
Picture
Glass Wrap of Modular Pads
Picture
Phase 1 Complete / Surface Prep Phase 2
Picture
Completed VE Linings & Glass Mat Curing
Picture
Modular Chemical Proof Blocks
Picture
Completed Containment / Equip Install
Picture
Concrete Demo
Picture
Vinyl Ester Prime and Void Filling
Picture
Completed Coatings
Picture
Glass Mat Application on curbs
Picture
Modular Chem Proof Blocks
Picture
Completed Containment/ Equip Install
Picture
Complete in Operation

Location

Contact Us
​​​​
​Office:  (801) 261-8525
Fax:  (801) 266-6645​


mail to:  sales@cdcrestoration.com
​​

Subscribe

Join our mailing list today!
Join Now

Picture